An architect’s daily email briefing is a single page, waiting before you leave for site, that tells you what each live project needs from you today. It should include anything from site that’s holding up work, RFI and submittal responses due, approvals waiting on you, decisions you’re waiting on from the client, and today’s meetings with what to bring to each. It ends with one line that says nothing else in the overnight mail is due today. That last line is what lets you close the laptop and drive.
- Group it by project, not by sender. Six messages about one job are one situation to settle.
- Put what blocks a crew first. A question with people standing behind it outranks everything else on the page.
- Pair each meeting with its open items. The site visit at 9:40 comes with the two RFIs on that job and the revision in play.
- Show what you’re owed, too. The consultant’s comment you asked for on Thursday belongs on the page, even though nothing arrived.
- Read it once, then act. Ten minutes at the kitchen table settles the day before the truck starts.
The phrase gets borrowed for three other things. Architecture newsletters like Dezeen Daily send you the news of the field. A design brief is the client’s statement of what the building has to do. And plenty of results for “email for architects” sell lists of architects’ addresses. This page is about the mail your own practice receives, read back to you each morning.
What a daily email briefing for architects surfaces
A practice inbox carries the same few kinds of mail every week. The briefing gives each one a line, in this order.
| Line | What it holds | Why it sits here |
|---|---|---|
| Blocking site | A contractor’s question with work waiting on the answer | A crew’s hour costs more than any other line |
| RFIs due | Each open RFI, its number and the reply date asked for | The contractor’s schedule is built around that date |
| Submittals | What came in, what’s due back, what’s still with a consultant | A late review moves the schedule and leaves a record |
| Approvals waiting on you | Change orders, pay applications, shop drawings to sign off | These sit on your desk, so nobody else will chase them |
| Waiting on the client | Decisions owed to you, and the date each one starts to slip | The client often doesn’t know their choice is on the critical path |
| Waiting on consultants | Comments and calcs you’ve asked for and not yet received | Another sheet usually depends on them |
| Permits and plan review | Comments from the building department, and hearing dates | They come rarely and matter a lot when they do |
| Today’s meetings | Site visits, client calls, coordination meetings | Each one comes with the open items for that job |
Two lines on that list are about mail that hasn’t arrived. That’s the difference between a briefing and a list of new messages. The engineer who hasn’t replied is as much a part of your day as the contractor who has.
Why RFIs and submittals carry their own clock, and how to rank one against another, is in email triage for architects. This page is the morning read that ranking produces.
One written out, for a Tuesday before site
Here’s the page itself, for a seven-person practice with five live projects. The principal is on site at Maple Street by 9:40.
Tuesday. 61 messages since 6:00 last night. 5 need you today. Nothing is blocking a crew.
24-117 Maple Street (site visit 9:40) Hollis Construction sent RFI 14 at 7:12 last night. Handrail bracket spacing at the stair, detail 6/A-501. They asked for a reply by Thursday. RFI 12 is answered and closed. The engineer’s response went out Friday. The stair shop drawings are still with Brandt Engineering. You sent them on September 28. Nothing back yet.
23-088 Linden Library The client hasn’t chosen between the two entry canopy options. You asked on September 24. The steel order is set for October 15. Pay application 7 arrived yesterday afternoon. It needs your certification by Friday.
24-031 Okafor House Plan review comments came in at 4:50 yesterday. Three items, all on the egress windows.
Today 9:40 Maple Street site visit, 60 minutes. 2:00 Linden Library client call, 30 minutes.
Nothing else in the 61 carries a date this week.
Read it and the morning sorts itself. RFI 14 is about the stair you’ll be standing at in two hours, so you look at the bracket on site and answer from there. The Brandt drawings are worth a call from the car. The canopy choice goes on the agenda for the 2:00. The plan review comments can wait for the afternoon. They need the drawings open, and you’ll be back at a desk by then.
Two projects aren’t on the page at all. That’s the briefing doing its job. Nothing moved on them, and nothing on them is due.
How a briefing differs from a design brief
They share a word and little else. A design brief is the client’s statement of what a project has to achieve. It’s written once, near the start, and revised when the scope changes. An email briefing is written every morning, for you alone, about every project at once.
| Design brief | Daily email briefing | |
|---|---|---|
| Who it’s for | The design team | The architect reading it |
| Who writes it | The client, often with the architect | You, an assistant, or software |
| What it covers | One project’s goals, program, budget and constraints | Every live project’s open items today |
| How long it lasts | The life of the project | One day |
| What it answers | What are we building? | What do I need to do before lunch? |
If you searched for a template for the client’s design brief, you need a different page. If you’re trying to get through the inbox before site, read on.
What to take with you to site
A site visit is the meeting where a missed email costs the most. You’re standing in front of the contractor, and the answer they emailed about is on your desk. So the meeting line on the briefing does a little more than give a time.
For each site visit, the briefing should carry:
- the open RFIs on that job, with the questions in one line each
- the latest drawing revision the contractor is building from
- any submittal still in review that touches the work you’ll see
- what you promised the contractor at the last visit, and whether it’s done
That’s the list you’d otherwise rebuild by searching the inbox in the parking lot. Tracking which drawing revision is actually in play is its own job, covered in the practice inbox. Preparing for any meeting from what’s in your mail is in how to prep for a meeting from your inbox.
Setting one up by hand
You can write this page yourself. It takes about fifteen minutes on a normal morning, and it’s worth doing for a week even if you plan to hand it off. You’ll learn which lines you actually use.
- Pick a fixed time. Early enough that you can still act on it. If you’re on site by 8:00, that’s 6:45, not 7:50.
- Keep a running note per project. One heading per job number, with the open RFIs, submittals and decisions underneath. You update it, you don’t rebuild it.
- Read the overnight mail one project at a time. Search by job number, then by the contractor’s and client’s names. Add what’s new to the note.
- Check the waiting-on list. Anything you asked for that’s now overdue moves up.
- Open the calendar last. Next to each meeting, write the open items for that job.
- Write the last line. Say out loud what you’re leaving for later. If you can’t, you haven’t finished the read.
Searching by job number only works if the job number is in the subject line. That habit, and a subject format for the whole practice, is in email triage for architects.
By hand, this holds up well for two or three live projects. Past five, or past about a hundred messages a day, the reading takes longer than the day allows. The note also lives in your head as much as on the page, so it doesn’t survive a week of leave.
Setting one up in Point
Point reads the night, so your briefing is ready when you are. Here’s what setup looks like.
Connect the mailbox you already use. Gmail and Microsoft 365 both connect, and your address, history and contacts stay as they are. Connecting Gmail without moving anything and the Outlook and Microsoft 365 path cover each.
Choose when it arrives. Set it for the hour that suits your day, and add a second read if your afternoons need one. What time should your daily briefing arrive? helps you place it.
Mark the people who matter on a live job. Star the client and the contractor’s project manager. Their mail weighs more from then on, so it reaches the top of the page. VIP mail that never gets buried covers who belongs on that list.
Decide what can’t wait for the briefing. A message from site that says a crew is stopped shouldn’t sit until tomorrow. You say what’s worth an interruption, and everything else waits for the morning read. What’s worth an interruption has the list written out.
Ask to be told when something lands. “When the city approves the Okafor permit, add a task to book the pre-construction meeting.” Point watches for it, and prepares the task when the approval arrives. Nothing is created yet. It waits for you, and one click is your go. Have the next step lined up when it arrives shows a watch end to end.
Before a meeting, Point can prepare you as well. Ahead of the Maple Street visit, you’d see what’s still open with Hollis, the answer they’re waiting for, and the one task on your side. Each one links back to the email it came from. That’s the site visit list above, gathered for you.
The briefing reads and counts. It doesn’t send anything. Replies and tasks it prepares wait for you by default, because review is where every action type starts. You can raise the setting one kind of action at a time, and at the top of the dial Point acts on that kind without asking. Setting how much your inbox does on its own walks through it. The briefing itself is yours to keep or switch off with one toggle.
How a whole-day briefing is built, and a five-day check for whether yours is covering your day, is in everything today asks of you, in one read. Point for architecture practices shows the rest of a practice’s day, and the benefits page lists everything Point does.
Common questions
What should an architect’s daily email briefing include?
Group it by project. For each live job, list anything from site that’s blocking work, RFIs and submittals due back, approvals waiting on your signature and decisions you’re waiting on from the client or consultants. Then list today’s meetings with the open items for each. End with a line that says nothing else in the overnight mail is due today.
How does a daily email briefing differ from a design brief?
A design brief describes what one project has to achieve, and it lasts the life of the project. A daily email briefing covers every live project’s open items, and it’s rewritten each morning.
What time should the briefing arrive if I’m on site early?
At least an hour before you leave. You want time to answer the one thing that blocks a crew and to make a call from the car. A briefing that lands while you’re driving is a summary you read at lunch. What time should your daily briefing arrive? covers placing it.
What happens after a week away on vacation?
The morning you come back is the hardest one. Point gathers the week into one catch-up digest, with the decisions still open at the top. How to read a catch-up digest after time away gives the order to read it in.
Can someone else in the practice prepare the briefing for me?
Yes, as long as they follow every live job closely. The hard part to hand over is knowing which quiet thread matters. An email assistant for architects sorts the jobs worth handing off from the ones to keep.
Does a briefing replace the RFI log?
No. The RFI log is the project record, kept in your project software or a spreadsheet. The briefing reads the mail around it each morning and tells you which entries need you today. The practice inbox covers where project software fits alongside email.